November 27, 2026 UMD Home FabLab AIM Lab
Angstrom Ebeam Evaporator PLC Driven -B Back to Equipment List
Operational Status ● Online
Description The Angstrom Ebeam Evaporator is a six-pocket electron beam evaporator. It features a planetary carousel that can hold up to five 4inch substrates at a time. This system is currently configured for metal deposition. The system cannot be used for oxide or nitride films as these can be done in our Denton Evaporator Precious metals surcharge(7/18): Au: $300 per 1000Å Pt: $100 per 1000Å Pd-$110 per 1000Å
Location FabLab | Dep Tunnel
Manufacturer
Staff Contact MarkMark Lecates
mlecates@umd.edu
301-405-5197
Rates
UMD
$81/hr
External Non-profit / University
$126/hr
Small Commercial / MTECH
$166/hr
Large Commercial
$242/hr
No Charge
$0/hr
Reservations
Date Start End User
11/30/2026 10:00 AM 12:30 PM Mark Lecates
12/01/2026 01:30 PM 03:30 PM Maxwell Xuan
12/02/2026 10:00 AM 12:15 PM Isaac Sherwood
Logs
Wed, Dec 02, 2026
10:00 am - 12:15 pm
Isaac Sherwood
View Reservation
100 nm Au
Tue, Dec 01, 2026
1:30 pm - 3:30 pm
Maxwell Xuan
View Reservation
Mon, Nov 30, 2026
10:00 am - 12:30 pm
Mark Lecates
View Reservation
Andrew
Tue, Nov 24, 2026
12:00 pm - 3:00 pm
Dev Udawattage
View Reservation
5 nm Cr 100 nm Au Gold charge=$300
Mon, Nov 23, 2026
3:45 pm - 5:45 pm
Siyi Zhang
View Reservation
Records to show:
SOPs
Manuals

You must have lab permissions to view the manuals.

Please login to view manuals or contact the lab staff to obtain permissions.

Recipes

Colleges A. James Clark School of Engineering
The College of Computer, Mathematical, and Natural Sciences

Communicate Join Email List
Contact Us
Follow us on TwitterTwitter logo

Links Privacy Policy
Sitemap
RSS

Copyright The University of Maryland University of Maryland
2004-2026