December 7, 2025 UMD Home FabLab AIM Lab
Angstrom Ebeam Evaporator PLC Driven -B Back to Equipment List
Operational Status ● Online
Description The Angstrom Ebeam Evaporator is a six-pocket electron beam evaporator. It features a planetary carousel that can hold up to five 4inch substrates at a time. This system is currently configured for metal deposition. The system cannot be used for oxide or nitride films as these can be done in our Denton Evaporator Precious metals surcharge(7/18): Au: $200 per 1000Å Pt: $100 per 1000Å Pd-$110 per 1000Å
Location FabLab | Dep Tunnel
Manufacturer
Staff Contact MarkMark Lecates
mlecates@umd.edu
301-405-5197
Rates
Large Commercial
$242/hr
Small Commercial / MTECH
$166/hr
External Non-profit / University
$126/hr
UMD
$81/hr
No Charge
$0/hr
Reservations
Date Start End User
12/08/2025 10:00 AM 01:30 PM Jay Easter
12/08/2025 02:00 PM 04:00 PM Chengdao Yu
12/08/2025 04:00 PM 06:00 PM Maxwell Xuan
Logs
Mon, Dec 08, 2025
4:00 pm - 6:00 pm
Maxwell Xuan
View Reservation
Mon, Dec 08, 2025
2:00 pm - 4:00 pm
Chengdao Yu
View Reservation
100nm Pt
Mon, Dec 08, 2025
10:00 am - 1:30 pm
Jay Easter
View Reservation
Cu - 500 nm
Fri, Dec 05, 2025
5:30 pm - 7:30 pm
Chengdao Yu
View Reservation

Deleted by: Chengdao Yu

Fri, Dec 05, 2025
3:15 pm - 5:15 pm
Hongyi Sun
View Reservation
Records to show:
SOPs
Manuals

You must have lab permissions to view the manuals.

Please login to view manuals or contact the lab staff to obtain permissions.

Recipes

Colleges A. James Clark School of Engineering
The College of Computer, Mathematical, and Natural Sciences

Communicate Join Email List
Contact Us
Follow us on TwitterTwitter logo

Links Privacy Policy
Sitemap
RSS

Copyright The University of Maryland University of Maryland
2004-2025